PACE YOUR RACE / THE METHOD
A model.
With its workings.
A finish-time goal determines the required average speed. A route and a mechanical model estimate the constant power needed to cover the terrain in that time.
Real route geometry
Seeded GPX files were supplied by Spera. Your GPX or TCX is parsed in your browser. Missing elevation stays unknown. Separate tracks are not joined with invented road. Route gaps prevent a complete pacing model.
Elevation and climbing
We use a centered 11-point moving average, with shorter windows at each end of a continuous track. Climbing sums positive changes after smoothing. The supplied East Side Classic long route gives about 572 m, compared with 758 m from raw elevations. The supplied Ride Joburg 2026 Garmin course gives about 1,032 m, compared with 1,059 m raw. This point-based window covers different distances as file sampling density changes.
Power and air density
The model balances gravity, rolling resistance and aerodynamic drag at steady speed for each segment. Drivetrain efficiency converts wheel power to pedal power. Acceleration, braking, corners, surface changes and stops are excluded. Signed wind describes a constant headwind or tailwind along the route, not a weather forecast.
Altitude changes standard atmospheric pressure. Expected temperature changes density through the ideal gas relation. Johannesburg's thinner air therefore affects drag. Editable mechanical coefficients are assumptions, not measurements of your equipment or position.
Sources: NASA atmosphere model and Martin and colleagues' road cycling power model.
Physical estimates and endurance
FTP alone cannot establish what you can sustain for a particular duration. A requirement above your entered FTP is flagged. A lower requirement is not a promise of feasibility. Drafting and sustainable variable-power plans need a reviewed policy before becoming available.
Heart rate cannot be predicted from speed, route geometry or a single threshold. Your heart-rate reference stays local. Use established zones and a practiced effort plan rather than treating a mechanical estimate as a heart-rate prescription.
Splits and feeds
Splits accumulate modelled segment time. Missing elevation produces distance-only splits at the target average speed. Feed cues distribute your chosen carbohydrate amount over time and map to predicted distance. These are arithmetic reminders, not nutrition recommendations. Aid stations are labelled only from supplied waypoints. Neither initial fixture includes aid-station waypoints.
Sharing and privacy
Rider measurements and upload geometry stay in your browser. Creating a link stores only the previewed generated summary, splits and feed quantities. Anyone with the anonymous link can open it for 30 days. Shared summaries are excluded from search indexing.
Daily counters record plan creation, successful sharing and paid-ride link clicks without rider identifiers. Daily abuse-prevention keys expire after 24 hours. Read our privacy notice.